diff options
author | Hiroshi Shimamoto <h-shimamoto@ct.jp.nec.com> | 2008-03-10 11:01:20 -0700 |
---|---|---|
committer | Ingo Molnar <mingo@elte.hu> | 2008-03-15 03:02:49 +0100 |
commit | 0e1f34833bd9170ccc93ab759e48e695917fa48f (patch) | |
tree | 2ca4b89dd755f2d82dbd34466a8cd6d8b5b4a0af /kernel/irq | |
parent | 4faa8496650f9417189dacce8f933e8ec61dc032 (diff) |
sched: fix race in schedule()
Fix a hard to trigger crash seen in the -rt kernel that also affects
the vanilla scheduler.
There is a race condition between schedule() and some dequeue/enqueue
functions; rt_mutex_setprio(), __setscheduler() and sched_move_task().
When scheduling to idle, idle_balance() is called to pull tasks from
other busy processor. It might drop the rq lock. It means that those 3
functions encounter on_rq=0 and running=1. The current task should be
put when running.
Here is a possible scenario:
CPU0 CPU1
| schedule()
| ->deactivate_task()
| ->idle_balance()
| -->load_balance_newidle()
rt_mutex_setprio() |
| --->double_lock_balance()
*get lock *rel lock
* on_rq=0, ruuning=1 |
* sched_class is changed |
*rel lock *get lock
: |
:
->put_prev_task_rt()
->pick_next_task_fair()
=> panic
The current process of CPU1(P1) is scheduling. Deactivated P1, and the
scheduler looks for another process on other CPU's runqueue because CPU1
will be idle. idle_balance(), load_balance_newidle() and
double_lock_balance() are called and double_lock_balance() could drop
the rq lock. On the other hand, CPU0 is trying to boost the priority of
P1. The result of boosting only P1's prio and sched_class are changed to
RT. The sched entities of P1 and P1's group are never put. It makes
cfs_rq invalid, because the cfs_rq has curr and no leaf, but
pick_next_task_fair() is called, then the kernel panics.
Signed-off-by: Hiroshi Shimamoto <h-shimamoto@ct.jp.nec.com>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Diffstat (limited to 'kernel/irq')
0 files changed, 0 insertions, 0 deletions